TUNNEL OF AVE VIGO-DAS MACEIRAS

Share it:

Tunnel for high speed Atlantic axis. We provide personnel for TBM´s production and we carry out the production, storage and transport of concrete segment. Besides of it, we also provide machinery: three tractor trcuks, loaders in precast Factory, loaders in connection galeries, truck 6×4 with crane Fassi 660 AXP for works in the construction site, truck6x6 with deposit of 15,000 liters for drainage and irrigation, etc..

Contractor: Vigo-Das Maceiras Joint Venture (FCC, Acciona)

100_0183 100_0188 100_0196 PLANTA MORTERO 053 VIGO 10-02-2012 083 VIGO 10-02-2012 129

en_USEnglish