TERRASA TUNNEL

Share it:

Construction of galleries by advance with mechanical means. The Brook demolition robot was used.

Contractor: Tunnel Terrassa Joint Venture (FCC-OHL-COPISA)

IMG00141-20100831-1125 IMG00142-20100831-1125 IMG00148-20100831-1200 IMG00167-20100915-1327

en_USEnglish