{"id":3376,"date":"2019-10-31T10:08:56","date_gmt":"2019-10-31T10:08:56","guid":{"rendered":"https:\/\/www.actyon.es\/?p=3376"},"modified":"2023-07-28T09:42:59","modified_gmt":"2023-07-28T07:42:59","slug":"actyon-brasil-construcao-metro-fortaleza","status":"publish","type":"post","link":"https:\/\/www.actyon.es\/en\/actyon-brasil-construcao-metro-fortaleza\/3376\/","title":{"rendered":"Metro \u2013 Fortress- ACTYON BRAZIL CONSTRU\u00c7\u00c3O"},"content":{"rendered":"<p>October 2019.<\/p>\n<p>Actyon Brazil Constru\u00e7\u00e3o, began to collaborate within the project Sentra Linha LEste \u2013 Strength, work allotted to Sacyr.<\/p>\n<p>The project consists in the first phase of the line having approximately a duration of 48 months. It will consist of the construction of 7.3 kilometres of tunnel, of which 6 km will be executed by the tunnel boring machine, such as 4 underground stations ( Central-Chico da Silva, Military College, Nunes Valente and Papic\u00f3n ). In addition, run the reinforcements in the tunnels where they will be screened the next few seasons of the next phase.<\/p>\n<p>Actyon we start to be part of this project by providing our staff specializes in TBM and the factory of voussoirs.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-medium wp-image-3377\" src=\"https:\/\/www.actyon.es\/wp-content\/uploads\/2019\/10\/TUNELADORA-METRO-FORTALEZA-300x203.jpg\" alt=\"\" width=\"300\" height=\"203\" \/><\/p>","protected":false},"excerpt":{"rendered":"<p>Octubre 2019. Actyon Brasil Constru\u00e7\u00e3o, comienza a colaborar dentro el proyecto Sentra Linha LEste &#8211; Fortaleza, obra adjudicada a Sacyr. El proyecto consiste en la primera fase de la l\u00ednea Este teniendo aproximadamente una duraci\u00f3n de 48 meses. Consistir\u00e1 en la construcci\u00f3n de 7.3 kil\u00f3metros\u00a0 de t\u00fanel, de los cuales 6 km ser\u00e1n ejecutados por [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":3379,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[64],"tags":[51,50,49,52,48],"class_list":["post-3376","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-obras","tag-brasil","tag-fase-1","tag-fortaleza","tag-linha-este","tag-metro"],"_links":{"self":[{"href":"https:\/\/www.actyon.es\/en\/wp-json\/wp\/v2\/posts\/3376","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.actyon.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.actyon.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.actyon.es\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.actyon.es\/en\/wp-json\/wp\/v2\/comments?post=3376"}],"version-history":[{"count":2,"href":"https:\/\/www.actyon.es\/en\/wp-json\/wp\/v2\/posts\/3376\/revisions"}],"predecessor-version":[{"id":5705,"href":"https:\/\/www.actyon.es\/en\/wp-json\/wp\/v2\/posts\/3376\/revisions\/5705"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.actyon.es\/en\/wp-json\/wp\/v2\/media\/3379"}],"wp:attachment":[{"href":"https:\/\/www.actyon.es\/en\/wp-json\/wp\/v2\/media?parent=3376"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.actyon.es\/en\/wp-json\/wp\/v2\/categories?post=3376"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.actyon.es\/en\/wp-json\/wp\/v2\/tags?post=3376"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}