{"id":7437,"date":"2024-09-18T13:24:21","date_gmt":"2024-09-18T11:24:21","guid":{"rendered":"https:\/\/www.actyon.es\/?p=7437"},"modified":"2026-11-02T10:11:49","modified_gmt":"2026-11-02T09:11:49","slug":"actyon-italy-trabaja-en-la-linea-de-alta-velocidad-passante-en-florencia-italia-copia","status":"publish","type":"post","link":"https:\/\/www.actyon.es\/en\/actyon-italy-trabaja-en-la-linea-de-alta-velocidad-passante-en-florencia-italia-copia\/7437\/","title":{"rendered":"Progress of the project of the new railway line Messina-Catania."},"content":{"rendered":"<h2><strong>Progress of the project of the new train line Messina-Catania.<\/strong><\/h2>\n<p>We are pleased to report on the progress of the project that includes the design and enforcement of the works for the construction of a new railway line of approximately 28,3 km in length. This ambitious project includes civil works, superstructure, electrification, signalling and telecommunications, as well as the construction of 2 tunnels natural monotube, 6 tunnels are double rooms and 7 viaducts.<\/p>\n<p>Currently, we are working on the stretch Messina-Catania, which is connected with the existing line before the station Fiumefreddo and re-link to the station of Giampilieri. Among the main works, highlights the Tunnel Sciglio, with more than 9 km in length, extends also on the lot adjacent to Taormina-Fiumefreddo, thereby becoming the longest tunnel of the entire stretch Giampilieri-Fiumefreddo.<\/p>\n<p>Our team assigned to this work is doing a great job, showing dedication and professionalism, values that characterize us. We thank the UTE Consorzio Messina Catania Lotto Nord-Lotto South by the trust placed in our technical team.<\/p>","protected":false},"excerpt":{"rendered":"<p>Actyon has built-in specialized personnel, including mechanical and electrical TBM, operators of injection and erectoristas, for the construction of the expressway S19 in Poland.<\/p>","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[70,51,185,187,186,175,177,95,62,45,88],"class_list":["post-7437","post","type-post","status-publish","format-standard","hentry","category-noticias","tag-actyon","tag-brasil","tag-linea-2","tag-linea-verde","tag-metro-de-sao-paulo","tag-personal-especializado","tag-sacyr","tag-sao-paulo","tag-tbm","tag-tunel","tag-tunnel"],"_links":{"self":[{"href":"https:\/\/www.actyon.es\/en\/wp-json\/wp\/v2\/posts\/7437","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.actyon.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.actyon.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.actyon.es\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.actyon.es\/en\/wp-json\/wp\/v2\/comments?post=7437"}],"version-history":[{"count":6,"href":"https:\/\/www.actyon.es\/en\/wp-json\/wp\/v2\/posts\/7437\/revisions"}],"predecessor-version":[{"id":9230,"href":"https:\/\/www.actyon.es\/en\/wp-json\/wp\/v2\/posts\/7437\/revisions\/9230"}],"wp:attachment":[{"href":"https:\/\/www.actyon.es\/en\/wp-json\/wp\/v2\/media?parent=7437"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.actyon.es\/en\/wp-json\/wp\/v2\/categories?post=7437"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.actyon.es\/en\/wp-json\/wp\/v2\/tags?post=7437"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}