Tunnel for high speed train. The tasks developed were the following: assembly of the TBM, preparation of formwork for the construction site. Production, installation and maintenance work of conveyor belts and pipes Workforce specialists :electricians, warehouse, bridge cranes, locomotives, etc.
Regarding the machinery, we provide the spayed concrete robot Putzmeister PM300
Contractor: Ute Túbas de Sorbas. (FCC-Sando)