Túnel Campobecerros

Planta Dovelas

Enero 2016 A fecha 28/01/2016 incorporamos el tercer turno de producción en la planta de dovelas de la Obra Túneles de Bolaños. Con este turno se prevé una producción diaria de 24 anillos

TUNNEL OF AVE VIGO-DAS MACEIRAS

Planta Mortero

Tunnel for high speed Atlantic axis. We provide personnel for TBM´s production and we carry out the production, storage and transport of concrete segment. Besides of it, we also provide machinery: three tractor trcuks, loaders in precast Factory, loaders in connection galeries, truck 6×4 with crane Fassi 660 AXP for works in the construction site, […]

Tunnel Of Trinitat (BARCELONA)

Img

Tunnel made by tunnel boring machine TBM doble shield. We carrie out the complete assembly and disassembly works of the TBM. In addition we perform the task related to poduction in TBM, facilities maintenance and locomotive maintenance. Contractor: Join Venture Tunnel Of Trinitat (OHL, ACSA)

SURIA TUNNEL

Cimg

We carry out the excavation of connection galleries by mechanical resources. Contractor: Suria tunnel joint venture (FERROVIAL-COPISA)

PERTHUS TUNNEL (GIRONA)

Img

Tunnel made with double shield TBM. The Works carried out are: assembly and disassembly of the tunnel boring machine, formwork and pouring of concrete,  electrical installation of BT, etc. Contractor: UTE Túnel del Perthus A.E.I.E. (Dragados, Eiffage).

SORBAS TUNNEL (ALMERÍA)

Sorbas

Tunnel for high speed train. The tasks developed were the following: assembly of the TBM, preparation of formwork for the construction site. Production, installation and maintenance work of conveyor belts and pipes Workforce specialists :electricians, warehouse, bridge cranes, locomotives, etc. Regarding the machinery, we provide the spayed concrete robot Putzmeister PM300 Contractor: Ute Túbas de […]

TERRASA TUNNEL

Img00142 20100831

Construction of galleries by advance with mechanical means. The Brook demolition robot was used. Contractor: Tunnel Terrassa Joint Venture (FCC-OHL-COPISA)

SABADELL TUNNEL (BARCELONA)

Lay Out Sabadell Aerea2

Tunnel for high speed train line. Work done with EPB tunneling machine. We provided production personel in TBM and outdoors. Contractor: UTE Túnel Sabadell (ACCIONA-COMSA-ACSA)

BESSONS TUNNEL (CATALUÑA)

Cimg

Tunnel built for the Segarra-Garrigues hydraulic channel. It was made with double shield TBM. We provide personnel of all kinds for both TBM and outdoor production. Contractor: UTE Les Garrigues – Section V (ACCIONA-ACSA- Const. RUBAU).

TUNNEL OF CAMPOBECERROS (A GUDIÑA)

Madrid-Galicia high-speed train line. TBM tunneling excavation. We provide personnel for production of precast concrete and the transfer and placement. Once placed, we perform the mortar injection between the sides for the waterproofing of the tunnel. Contractor: UTE Túneles de Bolaños (FCC and Acciona).

INTAKE HYDROELECTRIC POWER PLANT. (NAVARRA)

05 04 08.

Completion of formwork, climbing platform, supply and placement of rebar. Moreover of these Works, one tower crane and several boom trucks  were provided. Contractor: UTE CH Toma (Befesa-Iberdrola).

Quejigares Tunnel (Granada)

Fa1563

Tunnel for high speed train. All works related to the precast concrete, from the manufacture to transfer and collection. Contractor: UTE Quejigares. (Dragados-Tecsa).

Grupo Actyon
Resumen de privacidad

Esta web utiliza cookies para que podamos ofrecerte la mejor experiencia de usuario posible. La información de las cookies se almacena en tu navegador y realiza funciones tales como reconocerte cuando vuelves a nuestra web o ayudar a nuestro equipo a comprender qué secciones de la web encuentras más interesantes y útiles.