Tunnel made with double shield TBM. The Works carried out are: assembly and disassembly of the tunnel boring machine, formwork and pouring of concrete, electrical installation of BT, etc.
Contractor: UTE Túnel del Perthus A.E.I.E. (Dragados, Eiffage).
