April 2016
![La Garagua](https://www.actyon.es/wp-content/uploads/2017/06/La-Garagua-300x169.jpg)
The TBM named “La Garagua” arrived on April 21 at the metro station built in the La Jipipapa sector. This machine began the excavation in the Labrador´s station and perforated 1.050 meters of tunnel. In the operation 700 were placed to form the underground road throught wich 3 trains will circulate.