Cádiz Bridge

Share it:

Cable-stayed bridge for the transit of vehicles and high-speed train.

The works developed were placement of rebar, formwork and pouring of concrete in the piles of the bridge.

Contractor: UTE Puente de Cádiz (Dragados and Drace).

1-6-10 102_0056 Cadiz 088 Cadiz 090 Cadiz 169 Cadiz 172

en_USEnglish